Wednesday, 4 October 2023

LO2 - Risk Assessment (P3)

 Risk assessment:

During the production of filming, I need to take into considerations of the risks and recognise them so when filming I'll be cautious and prevent them from happening. Here are the risks I have identified for both Idents:

Locations

Hazards

Risk rating

Controls

All locations

Bad weather conditions

Medium

Check the weather the night before.

All locations

Battery might die 

Low

Always have a charger with me. Garden is at my house so I can use the charger there. Barkingside Park is 5 minutes away from my grandma's house so I can charge there.

Milhan’s Garden

Garden is small and cramped

Low

May be cramped and hard to place equipment down but will practise where the most suitable place to place it.

Barkingside Park

Someone may steal the equipment

High

Keep someone close to the equipment. I can since I will only be filming the sky.

Barkingside Park

Floor may be wet/slippery

Medium

Be aware of where walking and placing equipment down so I won’t slip and the equipment won’t get dirty


No comments:

Post a Comment

LO4 - Evaluation (P6, D1, D2)